Day 1
Overview (2 hours)
- Announcements and introductions
- Introduction to Pavement Preservation Concept
- Flexible pavement distress types
- Types of treatments
- When and where to use the treatments
Day 2
Materials and Mix Design (2 hours)
- Review of Day 1 and plans for Day 2
- Chip seals
- Emulsion
- Hot applied
- Scrub seals
- Other-Interlayers
- Slurry seals
- Microsurfacing
- Cape Seals
- Fog seals
- Review of Day 2 and plans for Day 3
Day 3
Construction (2 hours)
- Construction sequence for the various treatments
- Surface preparation
- Crack sealing
- Patching
- Milling iv. Others
- Production
- Placement
- Agency inspection
- Cleanup
- Surface preparation
- Chip seals
- Slurry seals
- Microsurfacing
- Fog seals
- Summary of Day 3
Day 4
Quality Assurance and Troubleshooting (2 hours)
- Topics to be covered in Day 4
- Quality control
- Agency inspection, documentation, and reporting
- Troubleshooting problems
- Check lists
- Summary of Day 4
- Course evaluations