Construction Inspection of Traffic Signals (PD-02) Course Outline

Section: Overview of Inspection, Plans, Design, and Bidding (2.5 hours)

Section One: Introduction to Inspection

  • Qualities & Skills of a Good Inspector
  • Traffic Signal Project Flow Diagram
  • Industry Standards & Design References

Section Two: Plans and Specifications Overview

  • Intersection Layout
  • Legends & Abbreviations
  • General and Project Notes
  • Signal Equipment Schedule
  • Phasing Diagram 
  • Conductor Schedule 
  • Service Equipment - Wiring Diagram 
  • Signal Head Visibility

Section Three: Designs, Bids and Awards

  • Bid Documents
  • Disadvantaged Business Enterprise (DBE)
  • Engineer’s Estimate
  • Bid Proposals & Project Schedule
  • Insurance Requirement & Bonds
  • Labor Laws
  • Bid Award & Notice to proceed
  • Payment and Cash-flow Management

Session 2: Pre-Construction Preparation and Equipment Familiarization (2.5 hours)

Section Four Pre-Construction

  • Importance of the first Pre-construction Meeting
  • Scheduling
  • Encroachment Permit
  • Staging of Materials and Personnel
  • Traffic Control
  • Utilities and USA
  • Workers Safety

Section Five: Traffic Signal Equipment (The Nuts and Bolts)

  • Materials Submittals
  • Signal Poles Foundation
  • Conduits and Pull Boxes
  • Directional Drilling
  • Traffic Signal Cabinets (Types, Foundation, and Grounding)
  • Wiring and Splices (Types and Standards) 

Session 3: Pedestrian, Bicycle, Communication, Finals (2.5 hours)

Section Six: Detection

  • Detection Loops and Systems
  • Video Detection 
  • Video Detection Camera Location

Section Seven: Pedestrians

  • Pedestrian Push Buttons
  • Pedestrian Ramps
  • Pedestrian Control (CAMUTCD) 
  • Pedestrian Safety & Americans with Disability Act (ADA)

Section Eight: Communication

  • Copper
  • Wireless 
  • Fiber 
  • Cellular 
  • Lease Lines

Section Nine: Record Keeping & Finals

  • Daily Logs: What and How to Document
  • Requirements for State, Federal, and Private Projects 
  • System Testing and Commissioning
  • Turn-On Procedures and Acceptance
  • Maintenance strategies
  • Salvage procedures
  • Integration of modern signal technologies 
  • Punch List Management
  • Project Finalization and Handoff